Florida Air National Guard-Construct Camp Kong Road and
Storage Bldg. #1052 Improvements
Installation of a new concrete floor slab for a 5,000
sq. ft. existing metal canopy and adding metal frames
and enclosures with two overhead doors and two main
doors. Phase II
includes addition of approximately 2000 linear feet of
asphalt road to the storage facility.